- The mass flow controller is received and visually
inspected for damage.
- The mass flow controller is logged into our computer,
which generates a worksheet displaying the proper
standard and applicable calibration data.
- Pre-Calibration data is taken and graphed per customer
request (additional fee).
- The mass flow controller is completely disassembled and
ultrasonically cleaned.
- All seals are replaced and the mass flow controller
is re-assembled under a class 100 clean hood.
- The sensor current and bypass adjustments are made.
- The mass flow controller is adjusted for proper valve
tuning and response.
- The mass flow controller is tested for long-term drift.
- Calibration is performed to within +/- 0.2% FS at each
calibration point with a calibration cover installed.
- Pre-shipment leak testing to the manufacturers
specifications is performed.
- A Certificate of Compliance
summarizing the calibration data and repair report is
generated for your analysis and records.
Packaging and Shipping
- The mass flow controller is doubled bagged in anti-static
sleeving, and sealed in clean dry Nitrogen (all removed
parts are sealed and returned in a separate bag).
- The mass flow controller is then, double wrapped with
bubble wrapping, boxed and packed with Styrofoam.
We utilize a unique (100% in-process) Quality Control System. Our
Clean & Calibration procedures are divided into (4)
processes:
(1) Cleaning, (2) Assembly, (3) Calibration and, (4) Shipping
Each process is inspected for defects or faults before it is
transferred to the next station.
|